LOUDOUN COUNTY, VA
Northstar Boulevard, Phase II
ACEC/MW Honor Award Winner
CONNECTING TRAVELERS TO PLACES IN LOUDOUN COUNTY AND BEYOND
J2 served as the prime design engineer on
this transportation project that transforms
Northstar Boulevard into a major corridor
connecting the two fastest growing counties
in the region, Loudoun and Prince William
counties, and Dulles International Airport.
Completing the critical link from Route 50
to Tall Cedars Parkway supports current
and projected future growth in the region,
enhances mobility, and provides safer,
alternative routes for the traveling public.
J2 provided preliminary and final designs for roadway improvements consisting of 4,100 linear feet of new alignment, 1,900 linear feet of roadway widening, turn lanes at three intersections, and a 40-foot-wide depressed grass median. The project includes 10-foot-wide shared-use paths on both sides of the road and traffic signals with pedestrian controls at Route 50 and Tall Cedars Parkway.
![](https://static.wixstatic.com/media/3ec80f_1502342f21aa45ff954718ff20946773~mv2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/3ec80f_1502342f21aa45ff954718ff20946773~mv2.jpg)
![](https://static.wixstatic.com/media/3ec80f_8564886190654b2198a999c8a2daa05a~mv2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/3ec80f_8564886190654b2198a999c8a2daa05a~mv2.jpg)
![](https://static.wixstatic.com/media/b874e9_f543b36b6ad34871a39b381929e87f61~mv2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/b874e9_f543b36b6ad34871a39b381929e87f61~mv2.jpg)
![](https://static.wixstatic.com/media/3ec80f_1502342f21aa45ff954718ff20946773~mv2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/3ec80f_1502342f21aa45ff954718ff20946773~mv2.jpg)
THE SOLUTION
J2, working with the Loudoun County Floodplain Team, updated the existing model to correct the flow location and provide analysis approved by Loudoun County, VDOT, and FEMA with a CLOMR. J2 modeled multiple bridge options and provided a design that limits the flood elevation rise and minimized the bridge length. The final design reduced the multi-span bridge to a 150-foot single-span bridge resulting in considerable project savings and permit impacts.
THE CHALLENGE
The roadway alignment crossed the South Fork of Broad Run Major Floodplain at a 45-degree skew requiring a 480-foot multi-span bridge. J2 discovered the 100-year flow distribution at the crossing was located incorrectly within the model resulting in an increased 100-year flow by about 600 cubic feet per second at the crossing and a larger structure.
![northstar_0710.jpg](https://static.wixstatic.com/media/3ec80f_8a1ec6b49b2a4cf09c852c1817a5684a~mv2.jpg/v1/fill/w_307,h_230,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/3ec80f_8a1ec6b49b2a4cf09c852c1817a5684a~mv2.jpg)
![northstar_0718.jpg](https://static.wixstatic.com/media/3ec80f_901f099c00dc46158f3062190d28d321~mv2.jpg/v1/fill/w_308,h_231,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/3ec80f_901f099c00dc46158f3062190d28d321~mv2.jpg)
SERVICES
Surveys
Roadway Design
Engineering
Water Resources
Landscape Architecture
Construction Services
MARKETS
Transportation
LOCATION
Loudoun County,
Virginia
CLIENT
Loudoun County/VDOT
![salem-ave_0699.jpg](https://static.wixstatic.com/media/3ec80f_71cb74267a554f75bbfe80e49b3a5a78~mv2.jpg/v1/fill/w_320,h_240,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/3ec80f_71cb74267a554f75bbfe80e49b3a5a78~mv2.jpg)